TECH SPOT: SAMPLE CRE QUESTIONS (Part 2)

Share This Post

Share on facebook
Share on twitter
Share on email
Share on linkedin

 

1. The predicted reliability is higher than the long term realized probability. Which of the following is the MOST likely cause of this difference ?

A. Deterioration of the manufacturing processes and procedures.

B. Lack of adequate employee training and process audits.

C. The accumulation of random process variations.

D. A poor initial estimation of reliability.

 

2. In a corrective action system, trend analysis can be defined as :

I. Long-term movement. III. A cyclical component of a time series.

II. The short term status of problems. IV.. Seasonal variations.

A. I only

B. II and III only

C. I, II and III only

D. I, II, III and IV

 

3. The MOST valid source of failure rate data is :

A. Test data obtained under very closely controlled conditions.

B. Environmental test data.

C. The manufacturing process.

D. Operational data.

 

4. A comprehensive failure analysis and corrective action feedback loop must determine :

I. What failedII. How it failedIII. Why it failed.

A. I only

B. I and II only

C. II and III only

D. I, II and III

 

5. What is this system’s reliability at 700 hours?

Where component failure data is :

– Failure rate of A = 0.0007 failures/hrReliability of B = 0.92

– MTTF of C = 1400 hours – Reliability of D = 0.85.

A 0.986

B. 0.998

C. 0.994

D. 0.952

 

6. Given mean-time-to-failure of 200 hours for each of two components, what is the probability of system failure if both components operate in parallel for one hour ?

A. P = 0.010

B. P = 0.005

C. P = 0.001

D. P = 0.000025

 

7. Reliability prediction is :

A. A one time estimation process.

B. A continuous process starting with paper predictions.

C. More important than reliability attained in the field.

D. A popular method as simulation theory.

 

8. Ideally for a FRACAS to be effective, how many failures should be allowed to pass before corrective action is to be undertaken ?

A. First occurrence of a failure mode.

B. Second occurrence of a failure mode.

C. Third occurrence of a failure mode.

D. Fourth occurrence of a failure mode.

 

9. All of the following Boolean algebra expression are incorrect EXCEPT ?

A. 1 + 1 = 2

B. 1 – 1 = 1

C. 1 – 0 = 0

D. 1 + 0 = 1

 

10. What is the MOST accurate method to verify that the maintainability requirement of a design is being met ?

A. By analysis of the design.

B. By performing maintainability prediction.

C. By thorough design reviews.

D. By demonstration at the customer’s facility.

 

Picture © B. Poncelet https://bennyponcelet.wordpress.com

More To Explore

General

Reliability and Risk Division Committee has received the Gold award recognition for 2020

We are pleased to announce that the Reliability and Risk Division Committee has received the Gold award recognition for 2020. Measures included in the 2020 award program were: Contributions to ASQ thought leadership, as measured by myASQ content postings Member Engagement and Experience, as measured by myASQ activity and member increases Fiduciary responsibility, as measured

General

ASQ WCQI 2021

ASQ WCQI 2021 conference May 24 -May 28, includes:  Virtual opening session  2 keynote presentations  25 live presentations  70 on-demand presentations  Access to presenters via the WCQI Speakers Lounge  Access to exhibitors and ASQ resources in the WCQI Virtual Expo Hall  Daily peer-to-peer networking and live entertainment  Up to 5.0 RU  Member access to all

Scroll to Top